Posted on February 27, 2009 by tedhenry
Mon
Larvae 021009 – 3 beakers (~70 larave/beaker) – fed sonicated food first then brine shrimp
Larvae 021109 – 2 beakers (~140 larvae/beaker) – fed brine shrimp all the way
Larvae 021809 – 1 beaker (103) – fed sonicated food and brine shrimp at the same time
Young juveniles from January doing very well
Microscopy – artemia experiment
Setup spawning tanks
Tues
Spawning: [...]
Filed under: Lab outcomes | Leave a Comment »
Posted on February 27, 2009 by tedhenry
Jack
Getting the YFP construct going
June
Emily
M-F 9am-5pm
Pathway analysis
Reproduction experiment
Ping
Mon – setup spawning; water change in medium tanks; brine shrimp acid treatment experiment; larvae care
Tues – collect embryos; break down/setup spawning; brine shrimp acid treatment experiment
Wed – collect embryos; break down / setup Ann’s spawning tanks; reproduction exp.; brine shrimp acid treatment experiment
Thurs – reproduction exp.; brine [...]
Filed under: Uncategorized | Leave a Comment »
Posted on February 20, 2009 by tedhenry
Jack
Getting the YFP construct going
June
C60 measurement in brine shrimp
Elimination of C60 from brine shrimp
Zebrafish EE2 exposure via diet
Emily
M-F 9am-5pm
Pathway analysis
Reproduction experiment
Ping
Mon – setup spawning; water change in medium tanks; setup brine shrimp-C60 elimination experiement; take care of larvae
Tues – collect embryos; break down/setup spawning
Wed – collect embryos; break down spawning/setup spawning
Thurs – end elimination test; [...]
Filed under: Schedules | Leave a Comment »
Posted on February 20, 2009 by tedhenry
Mon
Water change – medium tank
Larvae care – 3 beakers (~90 larave/beaker) from 021009, 2 beakers from 021109 (~140 larvae/beaker)
Made new sonicated larvae food – for 021209; discarded old one
Fed 021109 brine shrimp
Tidied up fish room to make way for Ann’s experiment
Paramecia checked; 20 boxes made from last week’s petri dishes
Setup June’s artemia test; end on [...]
Filed under: Lab outcomes | Leave a Comment »
Posted on February 13, 2009 by tedhenry
Jack
Doesn’t know yet
June
Brine shrimp experiments
Draft for EE2 dietary exposure to fish
Dietary experiment design
Emily
M-F 9am-5pm
Pathway analysis
Reproduction experiment
Ping
Mon – setup spawning; water change in medium & big tanks; setup brine shrimp test; take care of larvae
Tues – collect embryos; break down/setup spawning; water change in big tanks
Wed – collect embryos; break down spawning/setup spawning
Thurs – end brine [...]
Filed under: Schedules | Leave a Comment »
Posted on February 13, 2009 by tedhenry
Mon
Water change – medium tanks
Siphoned big tanks; 30% water change
Paramecia split – new flasks made, petri dishes made
Paramecia count: 110 flasks, 20 petri dishes
Setup June’s artemia test
Tues
Spawning: ~400 embryos; labeled as 021009
No microinjection – Candace is sick
Breakdown/setup tanks
Jill training with Ping (breakdown tanks, make/collect brine shrimp)
Histology practice – Rachel D.
Wed
Spawning: ~500 embryos; labeled as 021109
No [...]
Filed under: Lab outcomes | Leave a Comment »
Posted on February 6, 2009 by tedhenry
Mon
C60 observation
Setup spawning tanks
Catfish primer arrived
Tues
Spawning: ~200 embryos; kept for Candace
No microinjection
Breakdown/setup tanks
RT-PCR
Jill training with Jack
Ping taught Jill to make fish water and breakdown spawning tanks
C60 observation
Histology practice – Rachel D.
Wed
Spawning: ~500 embryos; labeled as 020409
Microinjection
Breakdown tanks
Water quality test
Paramecia flask count: 102
Thurs
pH test
Paramecia checked
Jack & Emily are sick
Fri
No histology – DeOnna and Rachel are both [...]
Filed under: Lab outcomes | Leave a Comment »
Posted on February 6, 2009 by tedhenry
Jack
June
Artemia experiment draft
Dietary experiment draft
CYP1a
Emily
M-F 9am-5pm
Pathway analysis
Reproduction experiment
Ping
Mon – setup spawning; water change
Tues – collect embryos; breakdown/setup spawning
Wed – collect embryos; breakdown spawning
Thurs -
Fri – work on website; water quality tests
Ann
Mon
Check Paramecia~2hr
Microscope ~0.5hr
Centrifuge microcystis ~5hr
Tues
Microscope~1hr
Sex fish~2hr
Practice measuring fish ~1hr
Split paramecia ~2hr
Wed
Check paramecia~2hr
Microscope~1hr
Split microcystis ~0.5hr
Thurs
Sex fish~2hr
Dechorionate eggs ~1hr
pPractice egg counting ~1hr
Fri
Check paramecia~2hr
Microscope~1hr
Total ~24hrs
Candace
Rachel
Tuesday 11-12pm Work with [...]
Filed under: Schedules | Leave a Comment »